Large construction site on the Reutlinger University Campus: Mensa modernization started!

Large construction site on the Reutlinger University Campus: Mensa modernization started!

in Reutlingen is currently being built on the campus of the university. The impressive construction cranes and excavators reveal it: the general renovation of the cafeteria is in full swing and should be completed by an investment of over 31 million euros by 2026, as from GEA reported. The aim is not only to modernize the cafeteria, but also to make climate -friendly. This includes a thermally insulated facade, the connection to the district heating network and the installation of a photovoltaic system that is supposed to produce up to 85 kilowatts.

a new meeting point for students

The new cafeteria will be a central point of contact for the students. Spacious areas for a cafeteria and a cafeteria are planned on around 2,600 square meters, which should offer a high quality of stay. A public space with an open -air area is also integrated into the design to enrich campus life. Around 1,300 square meters for the performance electronics of the Robert Bosch Center and other student jobs are planned on the upper floor.

But that's not all! Another major project of the university - a state -of -the -art laboratory building - is also in the starting blocks. Although the permits were already granted in February 2023, the construction has not yet started. Some preparations, such as laying lines, were made, but the official start of construction is still pending. This new building will offer the latest laboratories and office space that should not only be available to the life sciences/applied chemistry, but also other faculties, according to the statements of My-stuwe .

Details
OrtReutlingen, Deutschland
Quellen