Bridge on the Wuhlheide in Oberschöneweide: full closure due to damage!

Bridge on the Wuhlheide in Oberschöneweide: full closure due to damage!
Oberschöneweide, Berlin, Deutschland - The bridge on the Wuhlheide in Berlin, which runs across the street on the Wuhlheide and the intersection of Edisonstrasse/Treskowallee in the Oberschöneweide district, was fully closed on April 30, 2025. This decision follows a current review of the structure, which documented a significant increase in the damage determined in 2017. The building, a nine -field clamping concrete structure, was built in 1989. The first defects were recognized eight years ago, but the progressive damage significantly affected the safety of the bridge.
During the exams in 2017, building materials and constructive defects and damage caused by alkali-silicic acid reactions were identified. In view of this findings, a load limit for vehicles over 3.5 tons was required. According to the current reports, the condition of the bridge is classified as "insufficient", with both the stand and traffic safety being severely restricted. Traffic redirections are carried out via the street on Wuhlheide and Rummelsburger Straße, while the parking space is closed under the bridge. Pedestrians, cyclists, trams and other motor vehicles can continue to use the road.
legal framework conditions
Responsibility for the maintenance and security of local bridges is usually among the construction load carriers, which are regulated by the street laws of the federal government and the federal states. These laws also stipulate that municipalities are generally responsible for the safety of their bridges. The monitoring and testing of such buildings is often based on DIN 1076, which describes the technical security standards.
Although the application of these standards is not required by law, compliance is practically expected. In the event of non -adjustments, both the construction load carriers and the representative engineers can be liable. One of the supervisory duties also includes ensuring that the engineers are qualified and comply with the technical standards, such as "https://www.deutsches-ingenieurblatt.de/deutsches-ingenieurblatt/archiv.
outlook and measures
The duration of the blocking of the bridge on the Wuhlheide is currently still uncertain. However, it is clear that urgent measures must be taken to ensure traffic safety. The responsible authorities and construction authorities must immediately take suitable steps in order to avoid a similar situation in the future.
The problem around the bridge on the Wuhlheide is an example of the challenges that many municipalities stand in the maintenance of their infrastructure. Efficient planning and execution of exams and compliance with norms are crucial to ensure the security of the transport infrastructure in the long term, especially in a city like Berlin, where traffic is a significant part of urban life. These challenges are increasingly relevant to the increasing demands on the safety and durability of buildings.
Details | |
---|---|
Ort | Oberschöneweide, Berlin, Deutschland |
Quellen |