Racetrack and Wiesenstraße in Eisenach: Massive construction sites provide chaos!

Racetrack and Wiesenstraße in Eisenach: Massive construction sites provide chaos!

In Eisenach, drivers face major challenges! From October 28th, the street at Köpping will be closed to around a month until November 29 due to cable shelter work. The extensive construction work will lead to stopping bans along the sidewalk, which could significantly impair traffic.

But that's not all! The racetrack will also be closed on half -sided from Monday, October 28th. This block affects the western direction of travel between Wiesenstraße and Mühlhäuser Straße, and is scheduled to continue until the end of October. A detour via Wilhelm Rinkens-Straße and Amrastraße is recommended, since the pedestrian path in this construction site area is also unusable. The background is urgently needed repairs on the gas network.

The Wiesenstraße remains completely closed between the racetrack and the copper hammer until May 2025, while working on the sewer. Access from both directions are no longer possible, and here too there is a stopping ban in order to be able to carry out the work smoothly. Attention drivers! You can find more details here .

Details
OrtEisenach, Deutschland

Kommentare (0)