Construction site chaos: summer vacation start for drivers in Hamm with road renovation and bridge to the bridge
Construction site chaos: summer vacation start for drivers in Hamm with road renovation and bridge to the bridge
construction sites on Kamener Straße affect traffic in Flierich
The residents of Flierich in Hamm will be confronted with construction work on Kamener Strasse in the coming months, which will significantly affect traffic. The first construction phase between the southern city limits of Hamm and the intersection of the country roads L667/L881 is now the focus of the renovation work. This is only the beginning of an extensive project that includes the roadway renovation and the new building of bridges.
renovation of the road as an urgent need
The roadway renovation on Kamener Straße is not only a measure to improve road quality, but also an urgent need due to the strong flow of traffic in this area. The road is regularly frequented by vehicles of all kinds, which increases the wear and tear of the surface.
bridge demolition and new building as a future challenge
Following the road renovation, the two bridges are torn down and rebuilt over the Seseke at the end of September. These bridges, which have suffered from a weight restriction for years and can only be driven by a lane, represent a risk of security and urgently need to be replaced. The upcoming blocking of Kamener Straße will force road users to choose alternative routes and to adjust to longer travel times. The construction work is crucial to improve traffic safety and infrastructure in this region in the long term.
The residents of Flierich are asked for understanding for the temporary inconvenience and asked to exercise special caution during the construction phases. It is recommended to pay attention to the signposted diversions and to avoid the construction site areas as far as possible in order to ensure that the construction work runs smoothly.
- Nag
Kommentare (0)