Delay of the renovation: Bremer Straße becomes a permanent construction site!

Delay of the renovation: Bremer Straße becomes a permanent construction site!

The planned basic repair of Bremer Straße between Sunderweg and the Harburg circumvention is postponed again. Instead of planning as originally planned for the coming days, the work should now only begin in mid-2026, such as "https://harburg-aktuell.de/news/news/erneute-verz%C3%B6auf-bei-der-hauptverkehr-bremer-stra%C3%9Fe.html" Target = "Blank" Rel = "noopener noreferrer "> harburg-aktuell.de reported.

The construction work will bring about significant changes, since Bremer Straße becomes a one -way street for the duration of the work for one year. This could lead to a significant traffic chaos, which critically noted André Trepoll from the CDU. An alternative route for traffic is not planned. There are also delays in the drinking water pipe projects of Hamburg Wasser. The completion of around 350 meters of lines between the Hamburg-Marmstorf motorway junction and the Appelbütteler Weg is now only expected at the end of February 2025.

Details of the renovation measures

The renovation of the road and the coincidence of Bremer Straße is part of a comprehensive project that also includes the establishment of barrier -free bus stops and filters for rainwater cleaning. Hamburg water will renew the drinking water pipes between the Hamburg-Marmstorf motorway and the Appelbütteler Weg, whereby the work will begin on September 2, 2024 and be completed by the end of January 2025. During this time, a total of 1,780 meters of drinking water line as well as 13 street crossings and 53 house connections are renewed.

The current Hamburg Water measures should not cause traffic impairments. Numerous construction measures on Bremer Strasse will also be planned in the future. This includes the fundamental repair of the southern area of ​​Bremer Straße through Autobahn GmbH from 2026 and the renovation of the Bremer Straße and Hohe Straße street through the state company streets, bridges and water (LSBG), which is scheduled to begin from October 2026. In summary, the renovation will affect about three kilometers of the street and take into account foot, bike and motor vehicle transport as well as local public transport, such as hamburg.de communicated.

Details
OrtBremer Straße, 21075 Hamburg, Deutschland
Quellen

Kommentare (0)