Bridge in Ravensburg: Assembly begins, completion not until 2026!
In Ravensburg, a new bridge is being installed over Wangener Straße, expected to be completed by June 2026.

Bridge in Ravensburg: Assembly begins, completion not until 2026!
A lot is happening in Ravensburg: work is currently underway at full speed on the new bridge, which will cross Wangener Straße at a dizzying 15 meters high for pedestrians and cyclists. Loud Swabian, an impressive crane with a lifting capacity of 650 tons is used to safely assemble the heavy bridge parts. The central support of the bridge has already been installed, highlighting the progress of the project.
The shell of the bridge will be completed in the next few days to pave the way for further work. These not only include the coating of the bridge, but also the connection to Veitsburgstrasse and Holbeinstrasse, which will significantly improve mobility in this area. The entire work is expected to be completed by around June 2026, so a little patience will be required until then.
Traffic disruptions and construction site update
It is important for residents and road users to know that Wangener Straße will be completely closed until Friday, October 31st. The construction work is taking its toll, but as the saying goes? “Where there is work, chips fall!” That is also the case in this case.
The technical services for bridge assembly are provided by a team that specializes not only in crane rental, but also in heavy transport and customized lifting solutions. The Crane team ensures that everything goes according to plan, not only lifting the heavy load, but also residents' expectations of improved infrastructure. The safety standards are high, which is guaranteed by certified employees.
It is important to mention that the bridge is not only a technical achievement, but also represents a significant step towards traffic safety for pedestrians and cyclists in Ravensburg. For example, the new transition will result in safer access to local shops and facilities.
The project will therefore have a positive impact on both the local infrastructure and the everyday lives of citizens. Everyone is excited to see what the final bridge will look like and hope that traffic can flow smoothly again soon.