Turbo renovation in Bad Cannstatt: House modernized in just 22 days!
Turbo renovation in Bad Cannstatt: House modernized in just 22 days!
Bad Cannstatt, Stuttgart, Deutschland - A remarkable transformation in Bad Cannstatt recently attracted attention. Dorothee Flaig and Achim Schmitt have renovated their family home in just 22 working days. This fast renovation concept shows how energetic renovations can be implemented in a short time frame. The measures included a new roof with a modern solar system, a insulated facade and an efficient heat pump in the basement, such as Esslinger Zeitung reported. It was essential for the builders to be on site during the renovation work, which required direct communication with the craftsmen.
But this type of renovation not only remains an issue in Bad Cannstatt. By 2045, around 20 million residential buildings in Germany have to become climate -neutral, which is a huge undertaking. The Federal Government has already created framework conditions with the building energy law and the heat planning law to promote the heat transition. Nevertheless, there is a lack of comparable instruments for the renovation of existing buildings. Current offers are often unattractive, lengthy and expensive, which ultimately prevents many owners from the implementation, such as agora energy transition this indicates.
a sprint for renovation
The so -called "renovation sprint" wants to counteract this. He aims to optimize processes and reduce the costs so that the renovation becomes easier, faster and affordable. An important feature of the renovation sprint is the concentration on a short core period of just one month for the actual construction work. The first pilot projects already show promising results and offer recommendations for action for future renovation projects.
The federal government does not miss the opportunity to support the energetic renovation of buildings. In 2023, a funding program was launched, which was concentrated on the climate -friendly new building and increased with 888 million euros, which results in a total of around two billion euros for various funding projects. From 2024 a revised federal funding for energy-efficient buildings (BEG) will also come into force, such as bundes- Government.de reported.
funding and support
The funding ranges from cheap loans for climate -friendly construction projects to special grants for energy renovations. Households that create an individual renovation timetable can expect a total funding of up to 20 %. The maximum eligible expenditure is 60,000 euros per residential unit with a renovation schedule. In addition, the heating exchange from 2024 is supported with a basic funding of 30 %.
It is clear that there is an urgency for a comprehensive improvement in energetic standards in German residential buildings. With innovative approaches and financial support, the way to climate -neutral residence could be paved - and Dorothee Flaig and Achim Schmitt's success story in Bad Cannstatt shows that it is possible to achieve a good result even in record time.
Details | |
---|---|
Ort | Bad Cannstatt, Stuttgart, Deutschland |
Quellen |
Kommentare (0)