MS Stubnitz stays on shipyard: ship lift between repair and new building
MS Stubnitz stays on shipyard: ship lift between repair and new building
Ship lift in Stralsund: Challenges and effects on the maritime community
in the Stralsund shipyard, located in the Vorpommern-Rügen district, has been unexpected difficulties for some time now, which have significant consequences for both affected ships and the local economy. The ship lift there, which was put into operation in 1997, stands still due to technical problems.
technical problems and repair work
The ship lift is an important element of the shipyard infrastructure and plays a central role in lifting and lowering ships. The city of Stralsund, as the owner of the lift, has announced that the repair is challenging due to the complex system, which consists of many special components and an outdated operating system. The maintenance team, consisting of urban employees and external experts, has their hands full to quickly complete the necessary repairs.
episodes for ships and ferries
One of the most affected units is the cultural ship MS Stubnitz, which has not been released from the shipyard for almost a week. It was originally planned to let the ship back to water on Wednesday of last week. However, the MS Stubnitz still sits on the lift in front of the large shipyard until the problems are fixed.
The difficulties also affect the white fleet, which urgently needs to repair one of their ferries. This ferry that runs on the Wittower ferry needs a new drive. However, as long as the ship lift is not ready for operation, the necessary repairs cannot be carried out, which temporarily limits ferry operation.
meaning for the regional economic structure
The persistent failures of the ship lift also skill light on the dependence of the maritime economy in the region of functional institutions. The shipyard plays an important role in the repair and maintenance of ships that are crucial for local tourism and transport sector. In the long term, the persistent disorder could endanger confidence in the city's maritime infrastructure.
outlook on future developments
The city of Stralsund plans to renew the ship lift in 2024 anyway. However, the current problems underline the urgency of these measures. The comprehensive repairs that are now necessary could also be seen as a possibility to improve the efficiency and reliability of the lifts to prevent future failures.
The repair work at the Ship lift in Stralsund is not only a technical problem, but also have far -reaching economic and social effects on the maritime community. The city administration and all companies involved are therefore faced with the challenge of finding a solution as soon as possible to maintain the important flow of traffic and the floating fun offers.
Kommentare (0)