Construction site alarm: traffic bottleneck on Schubertstrasse from November 12th!

Transparenz: Redaktionell erstellt und geprüft.
Veröffentlicht am

Restrictions on traffic in Ingolstadt from November 12th, 2025: Construction site on Schubertstrasse causes delays.

Einschränkungen im Verkehr in Ingolstadt ab 12.11.2025: Baustelle auf der Schubertstraße sorgt für Verzögerungen.
Restrictions on traffic in Ingolstadt from November 12th, 2025: Construction site on Schubertstrasse causes delays.

Construction site alarm: traffic bottleneck on Schubertstrasse from November 12th!

In Ingolstadt, drivers will face a number of challenges in the near future. From November 12, 2025, Schubertstrasse will be restricted due to construction work to renew the road, specifically asphalt repair. The traffic disruptions are announced from 7:30 a.m. to 5:00 p.m. on November 19, 2025. During this time, only one lane will be available alternating in both directions. The section between Forsterstrasse and the B13 (Nördliche Ringstrasse), which is 46 meters long, is affected. This information came from a report from the [Central Office for Traffic Management Bavaria](https://www.news.de/auto/859091527/verkehrsmelde-ingolstadt-zur-verkehrsstoerung-wegen-baustelle-sperrung-einschraenkung-von-12-11-2025- until-11-19-2025-restrictions-in-traffic-danger-of-traffic-congestion-in-ingolstadt-postal-code-85057-north-west-north-station-gabelsbergerstrasse-on-the-schubertstrasse/1/).

The construction site is shaping up to be a difficult phase for traffic in the city, especially since the current traffic situation in Ingolstadt is also tense. As information from stau.info shows, there have been several traffic disruptions on the A9 between Munich and Nuremberg in the last few days. The accident sites have now been cleared, but traffic jams are still an issue. Most recently, a 6.2 kilometer long traffic jam was recorded between Manching and Ingolstadt-Nord, where the average speed was only 22 km/h and time losses of up to 14 minutes had to be taken into account.

Traffic jams on the streets

It's not just the traffic disruptions due to planned construction sites that are causing a lot of patience. Several traffic jam reports were published on November 6, 2025, showing that drivers in the region repeatedly have to expect long waiting times. In particular, the A9 in both directions proved to be a hotspot for traffic delays, making travel through the city even more difficult.

A look at the current traffic situation suggests that the restrictions on Schubertstrasse in combination with the existing traffic jams on the motorway could lead to suboptimal traffic conditions. This could lead to a significant loss of time, particularly for commuters who use Schubertstrasse from the northwest of the city on their daily journeys.

More information and support

For anyone wanting to access WhatsApp Web on their desktop in the coming weeks, it's also important to check your connections. If you're having issues with slow message loading, completely disconnecting from the mobile app may help. On Techtudo you will find helpful tips on how to deal with connection problems in order to optimize usage.

In addition, it remains to be hoped that the construction work will be completed within the specified time frame and that the traffic situation in Ingolstadt will soon ease again. Drivers should prepare for the coming weeks in order to get to their destination with less stress.