Full closure of the L 330: Important renovation work from July 24th!

Transparenz: Redaktionell erstellt und geprüft.
Veröffentlicht am

From July 24th, the L 330 between Bruchhausen-Vilsen and Hoyerhagen will be closed for three weeks due to traffic safety work.

Ab dem 24. Juli wird die L 330 zwischen Bruchhausen-Vilsen und Hoyerhagen für drei Wochen aufgrund von Verkehrssicherungsarbeiten gesperrt.
From July 24th, the L 330 between Bruchhausen-Vilsen and Hoyerhagen will be closed for three weeks due to traffic safety work.

Full closure of the L 330: Important renovation work from July 24th!

From July 24th, state road 330 between Bruchhausen-Vilsen and Hoyerhagen will be completely closed for around three weeks. The closure is no coincidence: It serves to ensure traffic safety in the “Sellingsloh” forest area and the urgently needed renovation of the road. How Tixio Reportedly, trees that pose a danger to traffic will first be removed. These measures will also start on July 24th, parallel to the closure of the road.

But that's not all. The rehabilitation of the roadway will begin in two phases from July 28th. The first section extends from the “Citi oil” gas station in Bruchhausen-Vilsen to the “Zur Kleinbahn” street. The second section leads from the Hoyerhagen exit to Gehlbergen. It should be noted that despite the work, the cycle and pedestrian path remains usable, as does the Lower Saxony State Authority for Road Construction and Transport emphasized.

Detours and impact on traffic

Of course, with such an extensive construction site, there will also be diversion routes. Road users from Hoya are directed to Bruchhausen-Vilsen via the L 351, L 331 and L 202. For drivers coming from the west, opposite diversions apply. The road construction authority has also assured that the diversion routes will be coordinated with the responsible authorities such as the police and municipalities. This is also necessary because timely completion before the popular Brokser Markt in Bruchhausen-Vilsen is firmly planned.

The closure will also have an impact on public transport line 150, which connects Hoya with Bruchhausen-Vilsen and Syke. Stop relocations and certain service disruptions are to be expected. The Hoyerhagen stop will be renamed “Hoyerhagen, Zum Vorberg”, while replacement stops will have to be set up for Bruchhausen-Vilsen and Gehlbergen. All of these measures are necessary to ensure the safety of passengers and road users.

The work being carried out on the L 330 is not the only one in the country. The state road 94 between Glandorf and Bad Laer will also be completely closed in sections from mid-September. This construction work is expected to last until the end of 2024. Here too, diversion routes are planned to maintain accessibility for residents and traffic Glandorf informed.

During this time, the authorities ask for your understanding and warn of possible delays due to weather. The respective construction sites require increased attention in traffic and on the diversion routes. Anyone moving in the region should be particularly careful so that there are no unnecessary delays.