Construction site chaos: A565 and A59 closed between Bonn and Sankt Augustin!

Transparenz: Redaktionell erstellt und geprüft.
Veröffentlicht am

Traffic information Rhein-Sieg-Kreis: Construction sites and closures on the A565 and A59 from July 7th to 8th, 2025. Be aware of the risk of traffic jams!

Verkehrsinfo Rhein-Sieg-Kreis: Baustellen und Sperrungen auf A565 und A59 vom 07. bis 08. Juli 2025. Staugefahr beachten!
Traffic information Rhein-Sieg-Kreis: Construction sites and closures on the A565 and A59 from July 7th to 8th, 2025. Be aware of the risk of traffic jams!

Construction site chaos: A565 and A59 closed between Bonn and Sankt Augustin!

In North Rhine-Westphalia, drivers will face greater restrictions from July 7, 2025, especially on the A565 and A59 motorways. These changes are due to the increased need for road renovations. Traffic authorities are warning that traffic flow will likely be severely affected during construction work.

The most important information for travelers: The construction site on the A565 extends between Bonn-Beuel and the Bonn-Nordost triangle, where two lanes are narrowed because the left lane is closed. These measures are necessary to renew the roadway. The full closure begins on July 7th at 7 p.m. and ends on July 8th at 6 a.m. In addition, the transition to the A59 in the direction of Cologne will also be closed during this time. So informed [news.de](https://www.news.de/amp/auto/858755605/verkehrsmelde-nw-bonn-sankt-augustin-rhein-sieg-kreis-zur-verkehrsstoerung-wegen-baustell e-closure-from-07-07-2025-to-08-07-2025-restrictions-in-traffic-north-rhine-westphalia-danger of traffic jams-in-bonn-beuel-meindorf-on-a565-a59/1/).

Traffic disruptions on the A59

The A59 is not spared from the work either. Between the Bonn-Nordost triangle and the Sankt Augustin-West triangle, two right-hand lanes are also closed, which requires diversion to one lane. The worsening conditions will also create additional traffic jams on this road.

In addition, it is important to prepare for further construction sites in the surrounding area. As reported on verkehrslage.de, bridge work on the A565 will also be necessary by the end of September 2025: There are numerous restrictions between Bonn-Poppelsdorf and Bonn-Endenich that will significantly burden traffic. For example, between July 7th and 9th, 2025, traffic between Bonn-Hardtberg and Meckenheim-Nord will be single-lane.

Conclusion and recommended actions

It's worth planning alternative routes and checking the traffic situation regularly. The ADAC NRW also provides information on this, providing a comprehensive overview of current closures and diversions. Interested people should inform themselves on the ADAC in order to avoid unplanned travel time extensions.

Residents and road users are well advised to prepare for possible delays and, if necessary, consider using public transport. Although the upcoming renovation work is necessary, it brings with it some inconveniences that need to be overcome.