Stair arm! B2 closure between Puchheim and Germering begins with chaos

Stair arm! B2 closure between Puchheim and Germering begins with chaos
Traffic in the Germering and Puchheim region is currently still. The B 2 between Puchheim-location and the junction to the A 99 has been completely closed since Monday morning, June 23. The reason for this is urgently needed renovation work on the road, which have become inevitable due to numerous potholes. Merkur reports that this measure is indispensable for the safety of road users and to avoid major damage to vehicles.
The detour for traffic from Fürstenfeldbruck runs via Gröbenzell towards Munich-Lochhausen. Drivers from Germering, who want to leave the A 99 via the Germering Nord junction, should also use the detour via the Munich-Lochhausen junction and the needs-based detour route U 21. The State Building Office Freising is responsible for the renovation of the affected section. This work begins on June 23 and is expected to continue until July 13, unless weather conditions delay the progress, as stated by the germering.
traffic chaos and traffic jams
Already on the first day of the blocking there was considerable traffic jams on Augsburger Strasse in Puchheim-Ort and in Germering. Despite the official diversions, many drivers decided to take shorter routes through the city, which tightened the situation. Resentment was clearly felt on social networks, since many of the extended travel times reported and complained about poor signage. In addition, there were parked vehicles that also hinder the flowing traffic. Drivers are emphatically asked to use the specified detour routes and to follow the instructions of the traffic routing to reduce traffic jams.
In addition, an additional closure will take place from 8th to 10th July in the coming weeks on Münchner Straße in Fürstenfeldbruck, since the road at Emmeringer Strasse has to be narrowed for two days. During this time, residents of the suspended Emmeringer Straße can only drive and extend through Emmering. ADAC currently provides real-time traffic flow data to help drivers choose the best route and avoid possible disorders.
summarized the current traffic impairments in the region are the result of the necessary construction work and the attempt to improve the road conditions in the long term. Drivers should pay attention to the signposted diversions and, if necessary, plan alternative routes to minimize delays.
Details | |
---|---|
Ort | Fürstenfeldbruck, Deutschland |
Quellen |