Traffic confusion on the A39: construction site causes traffic jams until October!

Transparenz: Redaktionell erstellt und geprüft.
Veröffentlicht am

Traffic disruptions on the A39 near Wolfenbüttel: construction site until October 1st, 2025 causes road narrowing and risk of traffic jams.

Verkehrsbehinderungen auf der A39 bei Wolfenbüttel: Baustelle bis 01. Oktober 2025 sorgt für Fahrbahnverengungen und Staugefahr.
Traffic disruptions on the A39 near Wolfenbüttel: construction site until October 1st, 2025 causes road narrowing and risk of traffic jams.

Traffic confusion on the A39: construction site causes traffic jams until October!

In Lower Saxony there are currently significant traffic disruptions on the A39 motorway between Königslutter am Elm and Cremlingen. A construction site is causing a narrowing of the road that will last until October 1, 2025, 2:00 p.m. The traffic authorities warn of slow traffic flow and possible disruption in the area mentioned. The daytime construction site is active Monday to Wednesday between 7 a.m. and 2 p.m., which is likely to particularly affect commuters and travelers during the week. Regional drivers should prepare for possible traffic jams, especially on the routes between the postal codes 38154 Scheppau and 38162 Cremlingen. The status of the information is dated September 29, 2025, 6:24 a.m., as [news.de](https://www.news.de/auto/858993982/verkehrsmelde-koenigslutter-am-elm-cremlingen-landkreis-helmstedt-landkreis-wolfenbuettel-auf-a39-zur-ver Traffic disruption due to construction site with lane narrowing until October 1st, 2025, restrictions in traffic, danger of traffic jams in Lower Saxony-Scheppau-plz-38154-pl/1/) reported.

The A39, which runs from Seevetal near Wolfsburg to Holle, is 99.3 kilometers long in total and normally has two lanes in each direction. But the construction work comes at a price: the current restrictions can cause problems, especially with daily rush hour traffic. The construction work is part of a larger project that also takes into account the expansion of road infrastructure to improve traffic conditions in the region, as mentioned on staumelder-karte.de.

Traffic jams and other construction projects

The motorway triangles such as Wolfsburg/Königslutter and the Wolfsburg-West and Braunschweig-Gartenstadt junctions are particularly well-known traffic jams on the A39. Targeted expansion measures are actively trying to reduce the traffic load and improve the connection between Wolfsburg, Braunschweig and Lüneburg. These measures are important not only for traffic relief, but also for environmental protection by taking steps to reduce negative impacts, for example by building wild bridges and noise protection systems, as bmv.de highlights.

In addition to the existing construction sites, there are further restrictions on the A39 in the region, extending almost the entire length of the motorway. Drivers should always adapt to new traffic routings that become necessary as part of construction projects. These challenges require patience and good planning in order to reach the goal on time.

It is hoped that the coming weeks will bring a noticeable improvement in traffic flow as construction progresses. Until then, it's important to keep an eye on traffic news and plan alternative routes if necessary.