Traffic chaos on the A8: construction site near Tattenhausen poses a risk of traffic jams!

Transparenz: Redaktionell erstellt und geprüft.
Veröffentlicht am

Current traffic reports and construction sites on the A8 near Aichach-Friedberg: Restrictions and risk of traffic jams until July 1, 2025.

Aktuelle Verkehrsmeldungen und Baustellen auf der A8 bei Aichach-Friedberg: Einschränkungen und Staugefahr bis 1. Juli 2025.
Current traffic reports and construction sites on the A8 near Aichach-Friedberg: Restrictions and risk of traffic jams until July 1, 2025.

Traffic chaos on the A8: construction site near Tattenhausen poses a risk of traffic jams!

On the A8 near Tattenhausen, drivers are currently faced with a large construction site, which is causing some inconvenience. How news.de reported, road construction work over a length of 500 meters will be carried out from today, July 1, 2025, until 4 a.m. These concern the direction of travel from Stuttgart to Munich and take place between the Dasing (74b) and Adelzhausen (75) junctions. Traffic authorities advise driving carefully and considering alternative routes.

The work on the A8 is part of a comprehensive plan to keep the road network in good condition. As on the Autobahn GmbH website Bavaria As can be read, maintenance measures are essential in order to meet the high demand for transport. New construction and expansion measures are also necessary if the capacity of the existing roads is no longer sufficient. Therefore, modern workplace management is used to minimize the disruption to drivers.

Construction site overview on the A8

There are currently some construction sites on the A8 that can also lead to disruptions. According to the information from verkehrslage.de The following construction sites are active, among others:

  • A8 in Richtung Neunkirchen: Baustelle zwischen Zweibrücken-Ernstweiler und Einöd, bis 01.01.2028.
  • A8 zwischen Dreieck Leonberg und Engelbergtunnel: Nachtbaustelle in Richtung Heilbronn, bis 03.08.2025.
  • A8 München Richtung Stuttgart: Brückenarbeiten zwischen Adelzhausen und Dasing, Verkehr über den Standstreifen geleitet, links gesperrt bis 25.07.2025.
  • A8 München Richtung Salzburg: Ausfahrt und Einfahrt Bernau gesperrt wegen Markierungsarbeiten, bis 01.07.2025.

And that's not all: a traveling construction site will be set up between Sulzemoos and Odelzhausen, which will impose further restrictions. These multifunctional measures aim to optimally maintain the road and meet increasing traffic demand.

Drivers should find out about the current traffic situation in advance and, if necessary, plan alternative routes to avoid traffic jams and delays. The authorities ask for your understanding for the necessary work, which ultimately serves the safety and comfort of all road users.