Important traffic changes in Nuremberg: Sulzbacher Straße closed from Monday!
From October 27, 2025, Nuremberg will renew the road surface of the northern Sulzbacher Straße. Road users must expect closures and diversions.

Important traffic changes in Nuremberg: Sulzbacher Straße closed from Monday!
From Monday, October 27th, a major construction site will be set up in Nuremberg, which is of great importance for all road users. The northern Sulzbacher Straße will receive a new road surface, which will entail necessary but also temporary restrictions for drivers and cyclists. The construction work will last until November 5th, as Northern Bavaria reported.
The affected section extends between Rathenauplatz and Rudolphstrasse. Drivers must be prepared for the closures to be in place from Friday, October 24th. A one-way street regulation will be introduced between Rudolphstrasse and Harmoniestrasse, which will remain accessible towards the city center. The opposite direction will have to use diversions via Nunnenbeckstrasse and Merkelsgasse.
Cycling and access routes
Cyclists from the city center are also recommended to use Nunnenbeckstrasse and Merkelsgasse. There is a cycle lane towards the city center so that cyclists are not completely cut off from traffic. The access roads to the properties on northern Sulzbacher Straße and the sidewalks will remain untouched during the work, which is a relief for the residents.
In addition to these construction site projects, there are numerous roadway renovations throughout the city that are intended to improve the traffic situation. Loud Nuremberg.de Some work in Fischbach and Altenfurt was delayed due to a lack of personnel, but this is now to be continued. SÖR has set itself the goal of implementing several renovation measures per year.
Bicycle-friendly measures
An important aspect of these renovations is improving cycling. The conversion of several streets into bicycle streets is being planned, including closing the gaps in Strauchstrasse and Harsdörfferplatz as well as in Sperberstrasse and Kleestrasse. In addition, the Kleinreuther Weg neighborhood square will be redesigned by the end of June 2025 - an initiative that is intended to promote both walking and cycling and create an attractive place to stay.
Overall, the signs in Nuremberg point to a comprehensive modernization of the transport infrastructure. Prepare for temporary changes that will ultimately ensure greater safety and better traffic management in the city. For detailed information about the construction sites, you can also visit the website CSU King look around.